Site-Wide Downloads

A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | All


ABC Panel Discussion Notes


ABC Presentation


ABC Panel Discussion Notes

Topic: 2007 Engineering Conference

View notes.


ABC Presentation

Topic: 2007 Engineering Conference

View presentation


ABC Presentation (Power point)

Topic: 2008 ADOT Presentations

Added April 1, 2008


Arrow Bridge Placement (Video)

Topic: 2008 ADOT Presentations

Added April 1, 2008


AT 1, Legend Sheet

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 10A, CCTV Mounting Details

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008


AT 10B, CCTV Settings

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008


AT 11, CCTV Pole and NID Mounting Details

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)
Drawing replaced by new AT 11 set (AT 11A and AT 11B)


AT 12, CCTV Pole Foundations For Dedicated CCTV Pole

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 13, HAR Pole Detail

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008


AT 14, Weigh In Motion Piezo Details

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008


AT 15, RWIS Site and Foundation Details

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 16, RWIS Tower Base And Service Pad Layout

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 17, Ground Rod Installation and Tower Grounding

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 18, TMS Detection Zone Layout

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 2, Ramp Meter Details

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)
Drawing replaced by new AT 2 set (AT 2A and AT 2B)


AT 3A, Ramp Meter Sign Panel

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 3B, Ramp Meter Sign Panel

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 4, Typical Ramp Meter Signal Head Mounting

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008


AT 5, Ramp Meter Loop Installation

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 6, Conduit Details

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008


AT 7, Polymer-Concrete Junction Box Details

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)
Drawing replaced by new AT 7 set (AT 7A and AT 7B)


AT 8, ATMS Cabinet

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 9, ATMS Cabinet Disconnect And Transformer Frame

Topic: 2008 Individual Standard Drawings (DGN)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 1, Legend Sheet

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 10A, CCTV Mounting Details

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008


AT 10B, CCTV Settings

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008


AT 11, CCTV Pole and NID Mounting Details

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)
Drawing replaced by new AT 11 set (AT 11A and AT 11B)


AT 12, CCTV Pole Foundations For Dedicated CCTV Pole

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 13, HAR Pole Detail

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008


AT 14, Weigh In Motion Piezo Details

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008


AT 15, RWIS Site and Foundation Details

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 16, RWIS Tower Base And Service Pad Layout

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 17, Ground Rod Installation and Tower Grounding

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 18, TMS Detection Zone Layout

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 2, Ramp Meter Details

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)
Drawing replaced by new AT 2 set (AT 2A and AT 2B)


AT 3A, Ramp Meter Sign Panel

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 3B, Ramp Meter Sign Panel

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 4, Typical Ramp Meter Signal Head Mounting

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008


AT 5, Ramp Meter Loop Installation

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 6, Conduit Details

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008


AT 7, Polymer-Concrete Junction Box Details

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)
Drawing replaced by new AT 7 set (AT 7A and AT 7B)


AT 8, ATMS Cabinet

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT 9, ATMS Cabinet Disconnect And Transformer Frame

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008
For Supplemental Drawing Issue Seven
see [ls]Drawing Update Information
:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]:
October 29, 2009 (Posted November 18, 2009)


AT Series Drawings, EXE File Of All This Series PDF Files

Topic: 2008 Individual Standard Drawings (PDF)

Dated January 1, 2008


All Standard Specifications

Topic: 2008 Individual Standard Specifications

Executable zipped file with all individual Standard Specifications, 2008 version (Files in MS Word format)


All Checklist Files

Topic: 2008 Project Advertising Checklists

Updated November 18, 2009


AT 1, Legend Sheet (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 1, Legend Sheet (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 11A, CCTV Pole and NID Mounting Details (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 11A, CCTV Pole and NID Mounting Details (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 11B, Non-Intrusive Detector Mounting Details (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 11B, Non-Intrusive Detector Mounting Details (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 12, CCTV Pole Foundations For Dedicated CCTV Pole (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 12, CCTV Pole Foundations For Dedicated CCTV Pole (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 15, RWIS Site and Foundation Details (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 15, RWIS Site and Foundation Details (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 16, RWIS Tower Base And Service Pad Layout (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 16, RWIS Tower Base And Service Pad Layout (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 17, Ground Rod Installation and Tower Grounding (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 17, Ground Rod Installation and Tower Grounding (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 18, TMS Detection Zone Layout (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 18, TMS Detection Zone Layout (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 2A, Ramp Meter Details (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 2A, Ramp Meter Details (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 2B, Ramp Meter Details (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 2B, Ramp Meter Details (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 3A, Ramp Meter Sign Panel (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 3A, Ramp Meter Sign Panel (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 3B, Ramp Meter Sign Panel (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 3B, Ramp Meter Sign Panel (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 5, Ramp Meter Loop Installation (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 5, Ramp Meter Loop Installation (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 7A, Polymer-Concrete Junction Box Details (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 7A, Polymer-Concrete Junction Box Details (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 7B, Precast Concrete Fiber Optic and Utility Vault Details (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 7B, Precast Concrete Fiber Optic and Utility Vault Details (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 8, ATMS Cabinet (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 8, ATMS Cabinet (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 9, ATMS Cabinet Disconnect And Transformer Frame (DGN Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


AT 9, ATMS Cabinet Disconnect And Transformer Frame (PDF Supplemental File)

Topic: 2008 Supplemental Drawings

Supplemental Drawing: Approved October 29, 2009 (Posted November 18, 2009)


All Supplemental Drawings in Adobe PDF Format

Topic: 2008 Supplemental Drawings

Obtain Adobe PDF files for all Supplemental Drawings for 2008 Edition issued to date.


All Supplemental Drawings in MicroStation DGN Format

Topic: 2008 Supplemental Drawings

Obtain Microstation DGN files for all Supplemental Drawings for 2008 Edition issued to date.


All Supplemental Specifications (Adobe, PDF Version)

Topic: 2008 Supplemental Specifications

Obtain Adobe PDF files for all Supplemental Specifications for 2008 issued to date.


All Supplemental Specifications (Word, DOC Version)

Topic: 2008 Supplemental Specifications

Obtain MS Word files for all Supplemental Specifications for 2008 issued to date.


All Table of Contents Files

Topic: 2008 Table of Contents

Updated November 18, 2009  - Executable file


ABC Session, Engineers Conference - Nov 2009

Topic: 2009 Conferences/Workshops

This is a slide presentation, given by Fred Doehring and Mike Culmo, during the November 2009 UDOT Engineers Conference.


Addendum to UDOT Purchase Contract


Acceptance and Documentation for ABC Elements

Topic: ABC Acceptance and Documentation

Dated April 28, 2009


Access Management Principles


Acquiring Property For Utah's Transportation Projects Brochure


Acronym & Terminology


Utah Airport Development plan

Topic: Aeronautics

The Airport Development Spreadsheet allows the airport sponsors or engineers to enter their requests in an electronic format.


Aeronautics Division - Performance Audit

Topic: Aeronautics

The audit assessed the ownership and operations responsibilities of the Department of Aeronautics for aircraft used by Utah state agencies.


Airport Development Plan Guideline

Topic: Aeronautics

The Airport Development Plan (ADP) is UDOT's term to describe the capital improvement and maintenance plan for Utah public-use airports.


Agenda Summary File, April 2003 through Current

Topic: Agenda Summary File

Updated June 24, 2009


Alpine Elementary School


American Fork Jr. High School


Aspen Elementary School


ARRA Seasonal Sign Layouts

Topic: American Recovery and Reinvestment Act (ARRA) Stimulus Information

Updated March 19, 2009
PDF Summary Information
(File size: 1052 kb)


All Project Funding Source Signs

Topic: American Recovery and Reinvestment Act (ARRA) Stimulus Information

Updated March 19, 2009
File size: 1052 kb
EXE download file of all files on this Web page.

    • Needs to be run and will automatically unzip the files to C:\ARRA_StimulusSignDwgs


April 2009 $478/Ton New Format

Topic: Binder Index


Adele C. Young Intermediate School


American Leadership Academy


American Preparatory Academy


Access and Education Management Plan


Adaptive Management Plan


All Forms Download

Topic: Construction Forms

Update 11/05


Adams Elementary School


Adelaide Elementary School


Antelope Elementary School


Additional Elements


Agenda and Hand Out for May 21, 2008 Training Session


Altamont Elementary School


Agreement Between UDOT and FHWA for Approval of Categorical Exclusion Documents


Aesthetics Policy


Advanced Construction Projects Communication Model

Topic: Forms

Attached is a new communication process that FHWA would like us to follow when we are dealing with a phased project.


Appeals Process - Consultant Services

Topic: Forms

Added May 24, 2007


Antimony Elementary School


Academy Park Elementary School


Arcadia Elementary School


ATMS CABLE AND CONDUCTOR TEST

Topic: H. ITS/Traffic Management

Rev. 3/04


Albion Middle School


Alta View Elementary School


Altara Elementary School


AASHTO Report Powerpoint


Appendices


Access Management Plan -- Local Government


Adams Elementary School


Approved High Load Routes

Topic: Maps of Utah


Approved Routes for Western Regional Permits

Topic: Maps of Utah


Appendix B QC Elements and Example Plans


Appendix C Reference for Paired T Tests


Appendix E Sample Partnering Agreement

Topic: Materials Manual of Instruction (MOI) Part 8

Chapter 4: Quality Assurance


Art City Elementary School


August Press Release


Average Rates


A-1 Pioneer Enterprises, Inc.

Topic: Outdoor Advertising Hearing Findings

Findings and Final Order: A-1 Pioneer Enterprises, Hearing of November 27, 2001


Appendix A - 2007 UCASP


Appendix B - 2007 UCASP


Appendix C - 2007 UCASP


Appendix D - 2007 UCASP


Aging Culverts

Topic: Presentations

Denis Stuhff Maintenance Conference 2007


ATMS Memorandum

Topic: Project Management Forms

08/17/06 - Word format


ATMS Project Approval Form

Topic: Project Management Forms

08/17/06 - Word format


Addendum Letter Examples

Topic: Project Management Forms

01/08/09 - RTF(Word) format


Addendum Manual

Topic: Project Management Forms

01/08/09 - Word format


Assignment Order Form

Topic: Project Management Forms

10/25/07 - Word format


Amelia Earhart Elementary School


A Methodology for Determining Economic Impacts of Raised Medians: Data Analysis on Additional Case Studies, Texas Transportation Institute


A Methodology for Determining Economic Impacts of Raised Medians: Final Project Results


A Public Involvement Handbook for Median Projects, Center for Urban Transportation Research


Access Management Toolkit: Answers to Frequently Asked Questions, CTRE


Assessment of Economic Impacts at Selected Raised Median installation Locations in Texas


Approved Ropeway Inspectors


Application -- Qualified Engineer and Ropeway Inspector

Topic: Ropeway Forms


Application -- Wire Rope Inspector

Topic: Ropeway Forms


Albert R. Lyman Middle School


Ashman Elementary School


Appendix A - STANDARD SPECIFICATIONS

Topic: Small Projects

(sample for small projects)


Appendix C - Material Sampling and Testing

Topic: Small Projects

(sample for small projects)


Appendix D - DBE Policy

Topic: Small Projects

(sample for small projects)


Appendix D - Wage Rate Requirements

Topic: Small Projects

(sample for small projects)


Appendix E - Forms

Topic: Small Projects

(sample for small projects)


Appendix F - Right of Way Sheets

Topic: Small Projects

(sample for small projects)


Appendix F - Roadway Sheets

Topic: Small Projects

(sample for small projects)


Appendix F - Striping Sheets

Topic: Small Projects

(sample for small projects)


Appendix F - Typical Sections

Topic: Small Projects

(sample for small projects)


Appendix G - Enviromental Document

Topic: Small Projects

(sample for small projects)


Appendix H - 4600_lt-01

Topic: Small Projects

(sample for small projects)


Appendix H - 4600_lt-02

Topic: Small Projects

(sample for small projects)


Appendix H - 4600_lt-03

Topic: Small Projects

(sample for small projects)


Appendix H - 4600_lt-04

Topic: Small Projects

(sample for small projects)


Appendix H - 4600_sg-1a

Topic: Small Projects

(sample for small projects)


Appendix H - 4600_sg-1b

Topic: Small Projects

(sample for small projects)


Appendix H - 4600_sg-1c

Topic: Small Projects

(sample for small projects)


Appendix H - 4600_sg-1d

Topic: Small Projects

(sample for small projects)


Appendix H - 4600_sg-2d

Topic: Small Projects

(sample for small projects)


Appendix H - 4600_sg-s1

Topic: Small Projects

(sample for small projects)


Appendix H - 4600_sg-s2

Topic: Small Projects

(sample for small projects)


Appendix H - 4600_sg-s3

Topic: Small Projects

(sample for small projects)


Appendix I - Pot Hole Information

Topic: Small Projects

(sample for small projects)


Appendix I - Utility Sheets

Topic: Small Projects

(sample for small projects)


Appendix J - Sign Inventory

Topic: Small Projects

(sample for small projects)


Addendum to Special Event Guidelines for Bicycling

Topic: Special Event Permits

Published July 15, 2004
[ls]Link to additional information for bicycling on the State system:http://www.udot.utah.gov/main/f?p=100:pg:$SESSION::::V,T:,11[/ls]


Addendum to the Special Event Guidelines for Parades and Foot Races

Topic: Special Event Permits

Updatd March 30, 2009
Additional information to help your event run smoothly


Application for a Permit to Film on State Roads

Topic: Special Event Permits

Published July 15, 2004


Application for a Special Event Permit

Topic: Special Event Permits

Updated July 27, 2005
This application must be completed and submitted to the Region Permits Officer before a permit can be issued.


Artist's View from Wil's Memorial Park


Artist's view from the North Side of State Street


Asphalt Rates MT-05.08


Anna Smith Elementary School


April - June


April


August


April


August


April


August


April


August


April


August


April


August


Automatic Traffic Recorder Site Map


Appendix A Memo

Topic: Training


Appendix CC-EE(WP)

Topic: Training


Appendix CC-EE(Word)

Topic: Training


All About Big-Rigs

Topic: Truck Smart

1.85MB PDF File


ABC Decision Flow Chart

Topic: UDOT ABC Decision Flow Chart

Dated December 2007


Appendix A - Environmental Resources, Tools & Guidance: State and Federal Agency Links

Topic: UDOT Environmental Process Manual of Instruction

Added October 27, 2009


Appendix B - Sample Environmental Correspondence, Decision Documents and Related Items

Topic: UDOT Environmental Process Manual of Instruction

Added October 27, 2009


Appendix C - Blank Tier 1 Screening Form


Appendix C - Forms, Outlines & Flowcharts

Topic: UDOT Environmental Process Manual of Instruction

Added October 27, 2009


Appendix C - New Project Authorization


Appendix C - PDF Documents Combined


Appendix C - Programmatic 4(f) for Bridges


Appendix C - Programmatic 4(f) for Minor Takes


Appendix C - Programmatic 4(f) for Net Benefit


Appendix C - Programmatic 4(f) for Parks


Appendix C - TDS from Roadway Salt


Appendix D - Agency Contacts

Topic: UDOT Environmental Process Manual of Instruction

Added October 27, 2009


Appendix E - Acronyms

Topic: UDOT Environmental Process Manual of Instruction

Added October 27, 2009


Appendix F - Links to Approved Environmental Documents

Topic: UDOT Environmental Process Manual of Instruction

Added October 27, 2009


August 2009 - Monthy Report UDOT Qualified Labs


Ashley Elementary School


Arrowhead Elementary School


Appendix C-Must accompany Western Region Permit


Archaeolgy of the Bennington Bypass


Anti-icing Tank in Pup Trailer

Topic: Winter Maintenance

by Dave Babcock