Site-Wide Downloads
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | All
ABC Panel Discussion Notes
ABC Presentation
ABC Panel Discussion Notes
ABC Presentation
ABC Presentation (Power point)
Arrow Bridge Placement (Video)
AT 1, Legend Sheet
Topic: 2008 Individual Standard Drawings (DGN)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 10A, CCTV Mounting Details
AT 10B, CCTV Settings
AT 11, CCTV Pole and NID Mounting Details
Topic: 2008 Individual Standard Drawings (DGN)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009) Drawing replaced by new AT 11 set (AT 11A and AT 11B)
AT 12, CCTV Pole Foundations For Dedicated CCTV Pole
Topic: 2008 Individual Standard Drawings (DGN)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 13, HAR Pole Detail
AT 14, Weigh In Motion Piezo Details
AT 15, RWIS Site and Foundation Details
Topic: 2008 Individual Standard Drawings (DGN)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 16, RWIS Tower Base And Service Pad Layout
Topic: 2008 Individual Standard Drawings (DGN)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 17, Ground Rod Installation and Tower Grounding
Topic: 2008 Individual Standard Drawings (DGN)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 18, TMS Detection Zone Layout
Topic: 2008 Individual Standard Drawings (DGN)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 2, Ramp Meter Details
Topic: 2008 Individual Standard Drawings (DGN)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009) Drawing replaced by new AT 2 set (AT 2A and AT 2B)
AT 3A, Ramp Meter Sign Panel
Topic: 2008 Individual Standard Drawings (DGN)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 3B, Ramp Meter Sign Panel
Topic: 2008 Individual Standard Drawings (DGN)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 4, Typical Ramp Meter Signal Head Mounting
AT 5, Ramp Meter Loop Installation
Topic: 2008 Individual Standard Drawings (DGN)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 6, Conduit Details
AT 7, Polymer-Concrete Junction Box Details
Topic: 2008 Individual Standard Drawings (DGN)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009) Drawing replaced by new AT 7 set (AT 7A and AT 7B)
AT 8, ATMS Cabinet
Topic: 2008 Individual Standard Drawings (DGN)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 9, ATMS Cabinet Disconnect And Transformer Frame
Topic: 2008 Individual Standard Drawings (DGN)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 1, Legend Sheet
Topic: 2008 Individual Standard Drawings (PDF)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 10A, CCTV Mounting Details
AT 10B, CCTV Settings
AT 11, CCTV Pole and NID Mounting Details
Topic: 2008 Individual Standard Drawings (PDF)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009) Drawing replaced by new AT 11 set (AT 11A and AT 11B)
AT 12, CCTV Pole Foundations For Dedicated CCTV Pole
Topic: 2008 Individual Standard Drawings (PDF)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 13, HAR Pole Detail
AT 14, Weigh In Motion Piezo Details
AT 15, RWIS Site and Foundation Details
Topic: 2008 Individual Standard Drawings (PDF)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 16, RWIS Tower Base And Service Pad Layout
Topic: 2008 Individual Standard Drawings (PDF)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 17, Ground Rod Installation and Tower Grounding
Topic: 2008 Individual Standard Drawings (PDF)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 18, TMS Detection Zone Layout
Topic: 2008 Individual Standard Drawings (PDF)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 2, Ramp Meter Details
Topic: 2008 Individual Standard Drawings (PDF)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009) Drawing replaced by new AT 2 set (AT 2A and AT 2B)
AT 3A, Ramp Meter Sign Panel
Topic: 2008 Individual Standard Drawings (PDF)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 3B, Ramp Meter Sign Panel
Topic: 2008 Individual Standard Drawings (PDF)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 4, Typical Ramp Meter Signal Head Mounting
AT 5, Ramp Meter Loop Installation
Topic: 2008 Individual Standard Drawings (PDF)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 6, Conduit Details
AT 7, Polymer-Concrete Junction Box Details
Topic: 2008 Individual Standard Drawings (PDF)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009) Drawing replaced by new AT 7 set (AT 7A and AT 7B)
AT 8, ATMS Cabinet
Topic: 2008 Individual Standard Drawings (PDF)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT 9, ATMS Cabinet Disconnect And Transformer Frame
Topic: 2008 Individual Standard Drawings (PDF)
Dated January 1, 2008 For Supplemental Drawing Issue Seven see [ls]Drawing Update Information:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1942[/ls] or [ls]Supplemental Drawings:http://www.udot.utah.gov/main/f?p=100:pg::::1:T,V:1946[/ls]: October 29, 2009 (Posted November 18, 2009)
AT Series Drawings, EXE File Of All This Series PDF Files
All Standard Specifications
All Checklist Files
AT 1, Legend Sheet (DGN Supplemental File)
AT 1, Legend Sheet (PDF Supplemental File)
AT 11A, CCTV Pole and NID Mounting Details (DGN Supplemental File)
AT 11A, CCTV Pole and NID Mounting Details (PDF Supplemental File)
AT 11B, Non-Intrusive Detector Mounting Details (DGN Supplemental File)
AT 11B, Non-Intrusive Detector Mounting Details (PDF Supplemental File)
AT 12, CCTV Pole Foundations For Dedicated CCTV Pole (DGN Supplemental File)
AT 12, CCTV Pole Foundations For Dedicated CCTV Pole (PDF Supplemental File)
AT 15, RWIS Site and Foundation Details (DGN Supplemental File)
AT 15, RWIS Site and Foundation Details (PDF Supplemental File)
AT 16, RWIS Tower Base And Service Pad Layout (DGN Supplemental File)
AT 16, RWIS Tower Base And Service Pad Layout (PDF Supplemental File)
AT 17, Ground Rod Installation and Tower Grounding (DGN Supplemental File)
AT 17, Ground Rod Installation and Tower Grounding (PDF Supplemental File)
AT 18, TMS Detection Zone Layout (DGN Supplemental File)
AT 18, TMS Detection Zone Layout (PDF Supplemental File)
AT 2A, Ramp Meter Details (DGN Supplemental File)
AT 2A, Ramp Meter Details (PDF Supplemental File)
AT 2B, Ramp Meter Details (DGN Supplemental File)
AT 2B, Ramp Meter Details (PDF Supplemental File)
AT 3A, Ramp Meter Sign Panel (DGN Supplemental File)
AT 3A, Ramp Meter Sign Panel (PDF Supplemental File)
AT 3B, Ramp Meter Sign Panel (DGN Supplemental File)
AT 3B, Ramp Meter Sign Panel (PDF Supplemental File)
AT 5, Ramp Meter Loop Installation (DGN Supplemental File)
AT 5, Ramp Meter Loop Installation (PDF Supplemental File)
AT 7A, Polymer-Concrete Junction Box Details (DGN Supplemental File)
AT 7A, Polymer-Concrete Junction Box Details (PDF Supplemental File)
AT 7B, Precast Concrete Fiber Optic and Utility Vault Details (DGN Supplemental File)
AT 7B, Precast Concrete Fiber Optic and Utility Vault Details (PDF Supplemental File)
AT 8, ATMS Cabinet (DGN Supplemental File)
AT 8, ATMS Cabinet (PDF Supplemental File)
AT 9, ATMS Cabinet Disconnect And Transformer Frame (DGN Supplemental File)
AT 9, ATMS Cabinet Disconnect And Transformer Frame (PDF Supplemental File)
All Supplemental Drawings in Adobe PDF Format
All Supplemental Drawings in MicroStation DGN Format
All Supplemental Specifications (Adobe, PDF Version)
All Supplemental Specifications (Word, DOC Version)
All Table of Contents Files
ABC Session, Engineers Conference - Nov 2009
Topic: 2009 Conferences/Workshops
This is a slide presentation, given by Fred Doehring and Mike Culmo, during the November 2009 UDOT Engineers Conference.
Addendum to UDOT Purchase Contract
Acceptance and Documentation for ABC Elements
Access Management Principles
Acquiring Property For Utah's Transportation Projects Brochure
Acronym & Terminology
Utah Airport Development plan
Topic: Aeronautics
The Airport Development Spreadsheet allows the airport sponsors or engineers to enter their requests in an electronic format.
Aeronautics Division - Performance Audit
Topic: Aeronautics
The audit assessed the ownership and operations responsibilities of the Department of Aeronautics for aircraft used by Utah state agencies.
Airport Development Plan Guideline
Topic: Aeronautics
The Airport Development Plan (ADP) is UDOT's term to describe the capital improvement and maintenance plan for Utah public-use airports.
Agenda Summary File, April 2003 through Current
Alpine Elementary School
American Fork Jr. High School
Aspen Elementary School
ARRA Seasonal Sign Layouts
All Project Funding Source Signs
April 2009 $478/Ton New Format
Adele C. Young Intermediate School
American Leadership Academy
American Preparatory Academy
Access and Education Management Plan
Adaptive Management Plan
All Forms Download
Adams Elementary School
Adelaide Elementary School
Antelope Elementary School
Additional Elements
Agenda and Hand Out for May 21, 2008 Training Session
Altamont Elementary School
Agreement Between UDOT and FHWA for Approval of Categorical Exclusion Documents
Aesthetics Policy
Advanced Construction Projects Communication Model
Topic: Forms
Attached is a new communication process that FHWA would like us to follow when we are dealing with a phased project.
Appeals Process - Consultant Services
Topic: Forms
Added May 24, 2007
Antimony Elementary School
Academy Park Elementary School
Arcadia Elementary School
ATMS CABLE AND CONDUCTOR TEST
Albion Middle School
Alta View Elementary School
Altara Elementary School
AASHTO Report Powerpoint
Appendices
Access Management Plan -- Local Government
Adams Elementary School
Approved High Load Routes
Approved Routes for Western Regional Permits
Appendix B QC Elements and Example Plans
Appendix C Reference for Paired T Tests
Appendix E Sample Partnering Agreement
Art City Elementary School
August Press Release
Average Rates
A-1 Pioneer Enterprises, Inc.
Appendix A - 2007 UCASP
Appendix B - 2007 UCASP
Appendix C - 2007 UCASP
Appendix D - 2007 UCASP
Aging Culverts
ATMS Memorandum
ATMS Project Approval Form
Addendum Letter Examples
Addendum Manual
Assignment Order Form
Amelia Earhart Elementary School
A Methodology for Determining Economic Impacts of Raised Medians: Data Analysis on Additional Case Studies, Texas Transportation Institute
A Methodology for Determining Economic Impacts of Raised Medians: Final Project Results
A Public Involvement Handbook for Median Projects, Center for Urban Transportation Research
Access Management Toolkit: Answers to Frequently Asked Questions, CTRE
Assessment of Economic Impacts at Selected Raised Median installation Locations in Texas
Approved Ropeway Inspectors
Application -- Qualified Engineer and Ropeway Inspector
Application -- Wire Rope Inspector
Albert R. Lyman Middle School
Ashman Elementary School
Appendix A - STANDARD SPECIFICATIONS
Appendix C - Material Sampling and Testing
Appendix D - DBE Policy
Appendix D - Wage Rate Requirements
Appendix E - Forms
Appendix F - Right of Way Sheets
Appendix F - Roadway Sheets
Appendix F - Striping Sheets
Appendix F - Typical Sections
Appendix G - Enviromental Document
Appendix H - 4600_lt-01
Appendix H - 4600_lt-02
Appendix H - 4600_lt-03
Appendix H - 4600_lt-04
Appendix H - 4600_sg-1a
Appendix H - 4600_sg-1b
Appendix H - 4600_sg-1c
Appendix H - 4600_sg-1d
Appendix H - 4600_sg-2d
Appendix H - 4600_sg-s1
Appendix H - 4600_sg-s2
Appendix H - 4600_sg-s3
Appendix I - Pot Hole Information
Appendix I - Utility Sheets
Appendix J - Sign Inventory
Addendum to Special Event Guidelines for Bicycling
Topic: Special Event Permits
Published July 15, 2004 [ls]Link to additional information for bicycling on the State system:http://www.udot.utah.gov/main/f?p=100:pg:$SESSION::::V,T:,11[/ls]
Addendum to the Special Event Guidelines for Parades and Foot Races
Application for a Permit to Film on State Roads
Application for a Special Event Permit
Topic: Special Event Permits
Updated July 27, 2005 This application must be completed and submitted to the Region Permits Officer before a permit can be issued.
Artist's View from Wil's Memorial Park
Artist's view from the North Side of State Street
Asphalt Rates MT-05.08
Anna Smith Elementary School
April - June
April
August
April
August
April
August
April
August
April
August
April
August
Automatic Traffic Recorder Site Map
Appendix A Memo
Appendix CC-EE(WP)
Appendix CC-EE(Word)
All About Big-Rigs
ABC Decision Flow Chart
Appendix A - Environmental Resources, Tools & Guidance: State and Federal Agency Links
Appendix B - Sample Environmental Correspondence, Decision Documents and Related Items
Appendix C - Blank Tier 1 Screening Form
Appendix C - Forms, Outlines & Flowcharts
Appendix C - New Project Authorization
Appendix C - PDF Documents Combined
Appendix C - Programmatic 4(f) for Bridges
Appendix C - Programmatic 4(f) for Minor Takes
Appendix C - Programmatic 4(f) for Net Benefit
Appendix C - Programmatic 4(f) for Parks
Appendix C - TDS from Roadway Salt
Appendix D - Agency Contacts
Appendix E - Acronyms
Appendix F - Links to Approved Environmental Documents
August 2009 - Monthy Report UDOT Qualified Labs
Ashley Elementary School
Arrowhead Elementary School
Appendix C-Must accompany Western Region Permit
Archaeolgy of the Bennington Bypass
Anti-icing Tank in Pup Trailer
|